Product Production Setup
Build the product route from top to bottom. Add the work steps first, then assign materials and SOP/shop-paper filenames to each step.
Product: Bar Chair Regular Size back - 1600 (Build #9)
3
Add Materials to the Selected Step
Enter how much material is consumed when one item completes this step.
No step selected. Select a step in section 2 before adding materials.
| No materials have been added to the selected step. |
4
Add SOP Files to the Selected Step
List the Dropbox filenames employees need at this station. A step may have any number of files and file types.
Files for the Selected Step
First choose a step in Section 2, then identify the Dropbox file used at that station.
No step selected. Select a step in section 2 before adding SOP files.
Files Assigned to the Selected Step
| No SOP/shop-paper filenames have been added to the selected step. |
5
Product Setup Quick View
Review the complete route, time, materials, and SOP files for this product.
6 steps33 minutes per item4 material entries0 SOP files
Review setup: 2 step(s) have no materials listed. This may be intentional.
Step 1 — WOOD ROOM5 minutes per item
• Wood Pack L&C Bar — 1 set per item
No SOP files listed.
Step 2 — FOAM PREP5 minutes per item
• Foam Pack — 1 set per item
No SOP files listed.
Step 3 — FABRIC CUTTING3 minutes per item
• Fabric Yadkin Oatmeal — 0.5 yd per item
No SOP files listed.
Step 4 — SEWING13 minutes per item
• Gutermann Upholstery Thread - Brown #12584 — 5 yd per item
No SOP files listed.
Step 5 — UPHOLSTRY5 minutes per item
No materials listed (may be intentional).
No SOP files listed.
Step 6 — PACKING2 minutes per item
No materials listed (may be intentional).
No SOP files listed.