ProdLine V1
Production Management
Product Production Setup

Build the product route from top to bottom. Add the work steps first, then assign materials and SOP/shop-paper filenames to each step.

Product: CH 60 ROLLOVER (Build #10)
1
Add or Edit a Production Step

A step is one job the product must pass through, such as Cutting, Framing, or Packaging.

Assigned automatically. Reorder steps in the list below.
2
Select a Step

Select a step to edit it, add its materials, or list its SOP files. Drag rows by the handle to change the order.

MoveChooseStep OrderStationMinutes Per Item
↕ 1FABRIC CUTTING5.00
↕ 2SEWING15.00
↕ 3FOAM PREP2.00
↕ 4UPHOLSTRY5.00
↕ 5PACKING7.00
3
Add Materials to the Selected Step

Enter how much material is consumed when one item completes this step.

No step selected. Select a step in section 2 before adding materials.
Select a production step first
The quantity must be entered in this unit.

No materials have been added to the selected step.
4
Add SOP Files to the Selected Step

List the Dropbox filenames employees need at this station. A step may have any number of files and file types.

Company File Types

Create reusable categories such as Cut File, Material Layout, or Drawing. This does not require a selected step.

Files for the Selected Step

First choose a step in Section 2, then identify the Dropbox file used at that station.

No step selected. Select a step in section 2 before adding SOP files.
Optional if included in the filename.
Files Assigned to the Selected Step
No SOP/shop-paper filenames have been added to the selected step.
5
Product Setup Quick View

Review the complete route, time, materials, and SOP files for this product.

5 steps34 minutes per item7 material entries0 SOP files
Review setup: 1 step(s) have no materials listed. This may be intentional.
Step 1 — FABRIC CUTTING5 minutes per item
• MADRID BLACK — 4 yd per item
No SOP files listed.
Step 2 — SEWING15 minutes per item
• T-90 AMANN — 50 yd per item
No SOP files listed.
Step 3 — FOAM PREP2 minutes per item
• Foam Pack — 1 set per item
No SOP files listed.
Step 4 — UPHOLSTRY5 minutes per item
• CH 60'' BACK — 1 ea per item
• CH 60'' SEAT — 1 ea per item
• Foam Pack — 1 set per item
• MADRID BLACK — 1 yd per item
No SOP files listed.
Step 5 — PACKING7 minutes per item
No materials listed (may be intentional).
No SOP files listed.